CIVIL ENGINEERING & BUILDING CONSTRUCTION
Gadang Engineering (M) Sdn Bhd (“GESB”) which was established since 1980, is a wholly owned subsidiary of Gadang Holdings, has a Grade 7 registration with Construction Industry Development Board (CIDB) and obtained ‘Sijil Perolehan Kerja Kerajaan’ (SPKK) from CIDB.
GESB obtained its MS ISO 9001:2015 accreditation by the UKAS in respect of its Quality Management System for the scope of civil engineering and building construction and ISO 14001:2015 for Environmental Management System; ISO 45001:2018 for Occupational Health and Safety Management Systems accredited by SIRIM QAS International. GESB strives to continuously improve its safety at job site, work quality and efficiency of construction work processes.
GESB’s principal activities are bulk earthworks, highway and interchanges, bridges, piling and foundation works, utilities, tunnel & underpass, construction of commercial, industrial and residential buildings, design & build works, mass rapid transit works (railway).
Rapid Transit System Link (RTS LINK), Package 6
Location: Wadi Hana, Johor Darul Ta’zim
Description:Projeck Rapid Transit System Link (RTS Link) Antara Johor Bahru Dan Singapura. Package 6: Depot And Power Supply System.
Rapid Transit System Link (RTS LINK), Package 4
Location: Bukit Chagar, Johor Darul Ta’zim
Description:Projeck Rapid Transit System Link (RTS Link) Antara Johor Bahru Dan Singapura. Package 4: Bukit Chagar Station And Operation Control Centre.
Central Spine Road, Package 2
Location: Gua Musang, Kelantan Darul Naim
Description:Jambatan Sg. Lakit ke Gua Musang, Kelantan, Seksyen 2B: Paloh 2 ke Bukit Sejuk.
East Coast Rail Link (ECRL), Section 6
Location: Maran, Pahang Darul Makmur
Description:Construction and Completion of Subgrade, Drainage Works and Culvert Work from CH 410+293 to CH 424+182, Section 6.
Tun Razak Exchange, Package C6 – Public Realm Work
Location: Kuala Lumpur
Description:Contract 6A – Proposed Construction and Completion of Public Realm (Phase 1) at Tun Razak Exchange (TRX) based on consultant designed and the works to be completed within the sectional completion dates and areas as stipulated in Volume 1 Section 4.3 Sectional Completion.