Overview
The Sultan Abdul Halim Muadzam Shah Bridge (Penang Second Bridge) – Package 1 Main Navigation Spans and Substructure and Foundation Works for Approach Spans (Sub-Contract Works for the Supply and Installation of Decorative Lights at the Main Navigation Spans and Approach Spans).