Petronas Rapid Project, Package 14-0402

Utilities, Interconnecting, Offsite (UIO) Facilities: Procurement, Construction and Commissioning (PCC) of Civil & Infrastructure Works at Storm Water East Area.
Petronas Rapid Project, Package 14-1709

Procurement, Construction and Commissioning (PCC) of Fire Fighting Training Ground (FFTG) for CEFS Pengerang Integrated Complex (CEFS PIC).
Tun Razak Exchange, Package C9 – North South Steel Bridge

Cadangan Pembangunan Sebuah Jambatan Bertingkat Yang Menghubungkan Tapak Utara Dan Tapak Selatan Di Pembangunan Tun Razak Exchange (TRX) Yang Mengandungi: i) Laluan Untuk Kenderaan; ii) Laluan Untuk Pejalan Kaki; dan iii) Laluan Bertutup Untuk Pemasangan Utiliti (Tingkat Bawah) Di Seksyen 67, Jalan Sultan Ismail, Bandar Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur Untuk Tetuan TRX City Sdn. Bhd. (C9).
East Coast Rail Link (ECRL), Section 5

Construction and Completion of Subgrade, Drainage Works and Culvert Work from CH 410+293 to CH 424+182, Section 6.
East Coast Rail Link (ECRL), Section 6

Construction and Completion of Subgrade, Drainage Works and Culvert Work from CH 410+293 to CH 424+182, Section 6.
Cyberjaya Hospital

Proposed Development of Cyberjaya Hospital (288 Beds) on Lot 47686 and H.S.(D), 28779 PT No. 41461 at Persiaran Multimedia, Cyber 11, Cyberjaya, Mukim Dengkil, Daerah Sepang, Selangor Darul Ehsan.
KVMRT, Package V206 Serdang Raya – UPM

Construction and Completion of Viaduct Guildeway and Other Associated Works from Serdang Raya Station to University Putra Malaysia (UPM) Station.
Tun Razak Exchange, Package C3

The Execution and Completion of Works for Cadangan Penyuraian Trafik dan Kerja-Kerja Menaiktaraf Jalan Tun Razak dari Jalan Langgak Golf ke Bulatan Kampung Pandan, Kuala Lumpur (Package 2) untuk Tetuan TRX City Sdn. Bhd.
Tun Razak Exchange, Package C6 – Public Realm Works

Contract 6A – Proposed Construction and Completion of Public Realm (Phase 1) at Tun Razak Exchange (TRX) based on consultant designed and the works to be completed within the sectional completion dates and areas as stipulated in Volume 1 Section 4.3 Sectional Completion.