PL05 Bayan Lepas Light Rail Transit

Sub-Package PL05: Detection and Piloting of Pilecap And Other Associated Works from Fiz South to Permatang Damar Laut (Work Order No.: MTL/SRS/PL05/OVPR/WO/000011).

Bayan Lepas Light Rail Transit

The Implementation of Penang Transport Master Plan (PTMP) Component: Bayan Lepas Light Rail Transit (BL LRT) – Piloting Works (Package V4, V5 and V6).

Kuala Lumpur – Karak Highway, Package 2A

The Construction and Completion of Earthwork and Other Associate Works Package 2A: CH.39000 to CH.47580 for Proposed Widening of Kuala Lumpur-Karak Highway from KM19.20 to KM39.00 (Section 1) and From KM39.00 to KM61.50 (Section 2).

Data Centre At Klang Valley

Project Status : Project Details Location Contract Value Client Completion Date Scope / Type Project Duration   Back Overview Project Gallery EXPLORE MORE Other Projects

Central Spine Road, Package 2B

Lingkaran Tengah Utama (Central Spine Road). Pakej 2: Jambatan Sg. Lakit ke Gua Musang, Kelantan, Seksyen 2B: Paloh 2 ke Bukit Sejuk – Utilities Relocation Works for Air Kelantan Sdn. Bhd.

Rapid Transit System Link (RTS LINK), Package 4

Projek Rapid Transit System Link (RTS Link) Antara Johor Bahru Dan Singapura. Package 4: Bukit Chagar Station And Operation Control Centre.

Water Reticulation, Sewerage, Mechanical And Electrical Works.

9MWa.c LSSPV Solar Tawau

Engineering, Procurement, Construction and Commissioning (EPCC) Package 5.9MWa.c Large Scale Solar Photovoltaic (LSSPV) Project in Tawau, Sabah.

Coronade Tower 3

Nominated Sub-Contract For The Execution And Completion For Proposed Erection Of Construction And Completion Of 1 Block 31-Storey Office Tower Consisting Of 23 Floors Offices, 2 Floors Skybridge, 4 Floors Podium Carpark, 2 Floors Retail And 4 Floors Basement Carpark On Lot PTB 24665, Jalan Trus / Jalan Abdullah Ibrahim / Jalan Gereja, Mukim Bandar, Daerah Johor Bahru, Negeri Johor Darul Ta’zim for Coronade Properties Sdn. Bhd.